Delivery Information
All equipment is made to order so delivery times can vary.
We advise on steel fabrication an absolute minimum of 6 weeks though 8-10 weeks including galvanisation is recommended. Custom designs can take longer due to design times and potential prototyping runs.
Firing system panels and slats can be cut quickly once designs are complete and checked. If soldering of components is required this may take longer.
Cabling has an average of 1-2 weeks before dispatch.
Most parts are available in small numbers from the shelf but this does depend on availability.
Physical delivery is arranged to suit the customer and the volume of the order